
Out in the park

Clouds over the car park

Walking back

Out in the park

Clouds over the car park

Walking back
I’m Harsh, and I like making complicated things simple.
I’m a product and project manager in Hatfield. I’ve spent four years taking projects from discovery and scoping through to delivery, managing more than 15 of them end to end with teams of six to more than ten people, and I love designing, but I love leading and managing projects as well.
Product Designer
A snapshot of the work so far
01
0+
0+
0+
0+
0+
0+
Years of experience
02
0+
0+
0+
0+
0+
0+
Projects shipped
03
0+
0+
0+
0+
0+
0+
Industries served

A journey shaped by the teams I ran it with
Turito
SEO Intern
Delhi, India
I started on search, working on more than 100 blog pages and more than 20 YouTube videos for search ranking, and that’s where I learned how much the content and the structure decide whether anyone finds a product at all.
Silver House By RJ
UI/UX Designer
Lucknow, India
I designed for a jewellery brand where every screen was tied to revenue, and their online sales grew from nothing to over a thousand dollars a month.
Blank Multimedia
Creative Media Director and No-Code Developer
Lucknow, India
I ran creative and web delivery and more than 12 live events, including a 6-city tour with audiences of more than 3,000, and my pitch decks secured more than 5 sponsors. The redesigns I led lifted conversions by around 45%.
7 Seers Media
Co-Founder and Head of Product Design
Lucknow, India
I co-founded the studio and managed more than 15 projects end to end, on budgets of up to £30,000, with teams of six to more than ten people. I hired and trained 10 to 12 of them and decided who worked on what, and when.
University of Hertfordshire
MBA, Extended Professional Practice
Hatfield, United Kingdom
I’m reading for an MBA in Hatfield, with Project Management Methodologies as my elective, and I’m the Student Representative for my course. I’m looking for a 12-month project management placement starting in summer 2027.
How I work
I start with the decision, not the screen
Before anything gets drawn I want the brief turned into a numbered list of decisions, each one with an owner and a date, agreed in writing. Most of the work is deciding what to leave out, and it’s much easier to do that on a page than halfway through a build.
I start with the decision, not the screen
Before anything gets drawn I want the brief turned into a numbered list of decisions, each one with an owner and a date, agreed in writing. Most of the work is deciding what to leave out, and it’s much easier to do that on a page than halfway through a build.
decide it before you draw it.
the conditions are never ideal.
I design for the constraints that are actually there
Budgets are tight, dates are signed and legacy systems don’t move. I’d rather cut the scope early and ship the smaller thing on the date than hold on to a plan that was never going to work.
I design for the constraints that are actually there
Budgets are tight, dates are signed and legacy systems don’t move. I’d rather cut the scope early and ship the smaller thing on the date than hold on to a plan that was never going to work.
I write it down so nobody has to remember it
Every decision that moves money or time goes back to the team as a written document rather than a message in a thread. One update a week, in the same four parts: shipped, next, need from you, at risk.
I write it down so nobody has to remember it
Every decision that moves money or time goes back to the team as a written document rather than a message in a thread. One update a week, in the same four parts: shipped, next, need from you, at risk.
write it down.
stay until it ships.
I stay with it until it ships
I decide what gets built, I design it, and I’m still there when it goes out. I’d rather stay with something until it’s actually live than hand it over halfway.
I stay with it until it ships
I decide what gets built, I design it, and I’m still there when it goes out. I’d rather stay with something until it’s actually live than hand it over halfway.
The way I work
The way I work
Core
Capabilities
Delivery
Project delivery, end to end
Project delivery, end to end
Scope and cuts
Scope and cuts
Risk and dependencies
Risk and dependencies
Written updates
Written updates
Stakeholder decisions
Stakeholder decisions
Product
Requirements
Requirements
What version one is allowed to be
What version one is allowed to be
Prioritisation
Prioritisation
User flows
User flows
Prototyping
Prototyping
Design
Design systems
Design systems
Design tokens
Design tokens
Component libraries
Component libraries
Responsive design
Responsive design
Build
Framer
Framer
Shopify
Shopify
CMS and integrations
CMS and integrations
Handover
Handover
Ways of working
Notion
Notion
ClickUp
ClickUp
Excel
Excel
PowerPoint
PowerPoint
Lean Six Sigma
Lean Six Sigma
FAQ
Question
Are you a designer or a project manager?

Both, and that’s the point. I decide what gets built and write the requirements the build runs on, then I design it and I’m still there when it ships. On most teams those sit with two people, and the gap between them is where things tend to go wrong.
Question
Are you a designer or a project manager?

Both, and that’s the point. I decide what gets built and write the requirements the build runs on, then I design it and I’m still there when it ships. On most teams those sit with two people, and the gap between them is where things tend to go wrong.
Question
Do you build design systems, or just screens?

Systems, where the team is big enough to need one. On DadWell every colour was a semantic token so a change propagated instead of needing a sweep, and on Solika Arts four portals ran off one token set so a status colour landed in all four at once.
Question
Do you build design systems, or just screens?

Systems, where the team is big enough to need one. On DadWell every colour was a semantic token so a change propagated instead of needing a sweep, and on Solika Arts four portals ran off one token set so a status colour landed in all four at once.
Question
What does your process actually look like?

Four steps. Turn the brief into a numbered list of decisions with an owner and a date. Break the work down and name the risks early. Design the screens and build what I can myself. Then ship to the date and send one written update a week: shipped, next, need from you, at risk.
Question
What does your process actually look like?

Four steps. Turn the brief into a numbered list of decisions with an owner and a date. Break the work down and name the risks early. Design the screens and build what I can myself. Then ship to the date and send one written update a week: shipped, next, need from you, at risk.
Question
What kind of roles are you looking for?

Product and project management, particularly delivery roles in the NHS and IT, where the plan and the product decisions sit with the same person. I’m in Hatfield and I’m happy to travel to London.
Question
What kind of roles are you looking for?

Product and project management, particularly delivery roles in the NHS and IT, where the plan and the product decisions sit with the same person. I’m in Hatfield and I’m happy to travel to London.
